TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 08/22/2024
Notice Eff Time: 14:28:26 CDT
Notice End Date:
Notice End Time:
Notice ID: 14871634
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 08/22/2024
Post Time: 14:28:26 CDT
Prior Notice: 14835616
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update: Station 120 (Job #548015) Planned Outage and Maintenance Summary

Transco will be performing necessary maintenance associated with Job #548015 on its 2024 Planned Outage and Maintenance Summary. The Georgia Department of Transportation (GDOT) requires the relocation of Transco pipelines between compressor Stations 115 and 120 to allow for a roadway expansion. The maintenance outages will impact the availability of primary-firm transportation services moving south to north through Compressor Stations 115 and 120. The current schedule is August 26, 2024 through October 24, 2024.  During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving south to north through the location listed below will not be available.

Operating Conditions resulting from this work will also require Transco to manage primary-firm transportation services moving south to north through the TSB location listed below. The total quantity available will be contingent on system conditions during the maintenance period, and is anticipated to be initially limited to the quantities indicated below. Transactions moving north to south through this location will not be impacted.

The receipt-based Throughput Section Boundary (TSB) at MAINLINE MP 1031 will be used to manage capacity availability including any required changes to the expected total quantities available during this planned work indicated below. An updated Market and Production Area constraint notice will include the location and the available quantity of primary-firm transportation services during the indicated periods. 

TSB Name - Location

Location ID

Flow Direction

MAINLINE MP 1031 TSB

 9013083

South to North

 

 

Pipeline Maintenance

Estimated Outage

Total Primary-Firm Quantity Available Mdt/d

C-Line Relocation

August 26 – September 6

3,400

D-Line Relocation

September 7 – September 23

3,300

B-Line Relocation

September 24 – October 7

2,500

A-Line Relocation

October 8 – October 24

2,800

 

If you have any questions, please contact your Transportation Services Representative.