TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 08/22/2024
Notice Eff Time: 14:13:55 CDT
Notice End Date:
Notice End Time:
Notice ID: 14871601
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 08/22/2024
Post Time: 14:13:55 CDT
Prior Notice: 14769577
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 110 (Job 162127) 2024 Planned Outage and Maintenance Summary

Transco will be performing necessary line outage associated with Job #162127 on its 2024 Planned Outage and Maintenance Summary. This work will require a pipeline segment outage to allow for a pipe replacement project as required by regulation due to recent DOT Class Location changes in this area. The current schedule for this maintenance is September 15, 2024 through September 30, 2024

 

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving through the location may not be available. 

Operating Conditions resulting from this work could require Transco to manage primary-firm transportation services through Station 110. The total quantity available will be contingent on system conditions during the maintenance period. 

  

If the need to manage capacity availability occurs during this planned work, an updated Market and Production Area constraint notice will be released with further details. 

 

If you have any questions, please contact your Transportation Services Representative.