TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 07/31/2024
Notice Eff Time: 12:37:30 CDT
Notice End Date:
Notice End Time:
Notice ID: 14814560
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 07/31/2024
Post Time: 12:37:30 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 70 (Job 440482) Planned Outage and Maintenance Summary

Transco will be performing necessary planned maintenance associated with Job #440482 on its 2024 Planned Outage and Maintenance Summary. This maintenance activity requires a compressor station outage associated with turbine and electrical inspections which may impact the availability of all transportation services. The current schedule for this maintenance is August 28, 2024 through August 30, 2024 (“Maintenance Period”).

Operating Conditions resulting from this work will require Transco to manage all transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions during the Maintenance Period. Transactions moving north to south through this location will not be impacted.

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 662 (Station 70) will be used to manage the available capacity during this planned work. An updated Market and Production Area constraint notice will include the TSB location and the available quantity of all transportation services during the Maintenance Period.

TSB Name - Location

Location ID

Flow Direction

Total Quantity Available (Mdt/d)

Station 70 MP 662

9011500

South to North

2,125