TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 07/03/2024
Notice Eff Time: 14:35:38 CDT
Notice End Date:
Notice End Time:
Notice ID: 14735250
Notice Stat Desc: Initiate
Notice Type Desc: Maint / Other
Post Date: 07/03/2024
Post Time: 14:35:38 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 35 (Job 487433) 2024 Planned Outage and Maintenance Summary

Transco will be performing facility modifications which will require a compressor station and pipeline outage in a single line portion of the system associated with Job #487433 on its 2024 Planned Outage and Maintenance Summary. The current schedule for this maintenance is August 13, 2024 through August 22, 2024 (“System Outage Period”).

Operating Conditions resulting from this work will require Transco to restrict scheduled quantities to zero for all transportation priorities moving north to south and south to north through the locations indicated below.

The location Throughput Section Boundaries (“TSBs”) for station 35 at mainline milepost 327.27 S-N and 333.146 N-S will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSBs and the available quantity of primary-firm transportation priority during the indicated period.

TSB Name - Location

Location ID

Flow Direction

Total  Quantity Available (Mdt/d)

ML S35 S to N MP 327.27

9011644

South to North

0

ML TSB MP 333.146 N to S

9010879

North to South

0

During the System Outage Period, the locations identified below will not be available for gas flow and scheduling:

Location ID

Location Name

Flow Direction

1006261

NORTH MILTON M1628

Receipt

1006014

BAMMEL

Bi-Directional

If you have any questions, please contact your Transportation Services Representative.