TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 06/28/2024
Notice Eff Time: 14:16:00 CDT
Notice End Date:
Notice End Time:
Notice ID: 14721045
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 06/28/2024
Post Time: 14:16:00 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job 228811 Station 190 Line Outage 2024 Planned Outage and Maintenance Summary

Transco will be performing an interconnect abandonment project associated with Job #228811 on its 2024 Planned Outage and Maintenance Summary. This maintenance activity will require a pipeline segment outage that will impact the availability of primary firm transportation services through Station 190. The current schedule for this maintenance is July 11, 2024 through July 18, 2024. 

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through the location will not be available. 

Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving north to south through Station 190. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through this location will not be impacted. 

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1628.78 (Station 190) will be used to manage capacity availability during this planned work.

TSB Name - Location 

Location ID 

Flow Direction 

Total Primary-Firm Quantity Available (Mdt/d) 

Station 190 MP 1628.78 

9011620 

North to South 

2,300 

If you have any questions, please contact your Transportation Services Representative.