TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 06/18/2024
Notice Eff Time: 11:33:59 CDT
Notice End Date:
Notice End Time:
Notice ID: 14685998
Notice Stat Desc: Initiate
Notice Type Desc: Maint / Other
Post Date: 06/18/2024
Post Time: 11:33:59 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 80 Update - Unplanned Maintenance

After the completion of Station 80 planned maintenance (Job 185598), Transco has experienced operational issues at Station 80 due to challenges with some of the compressor units coming back online. Transco is currently working to assess the situation and will provide an expected timeline as soon as possible.

Operating Conditions resulting from this unplanned work will require Transco to manage transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions, but is anticipated to be limited to the quantity indicated below. Transactions moving north to south through this location will not be impacted. 

Effective June 19, 2024, the receipt-based Throughput Section Boundary (TSB) at mainline milepost 740.50 (Station 80) will be used to manage capacity availability including any required changes to the expected total quantity available during this unplanned work. An updated Market and Production Area constraint notice will include the location and the available quantity of  transportation services. 

TSB Name - Location 

Location ID 

Flow Direction 

Total Quantity Available (Mdt/d) 

Station 80 MP 740.50 

9012483 

South to North 

2,045

If you have any questions, please contact your Transportation Services Representative.