TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 02/09/2024
Notice Eff Time: 12:29:33 CST
Notice End Date:
Notice End Time:
Notice ID: 14304792
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 02/09/2024
Post Time: 12:29:33 CST
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Unplanned pipeline segment outage in Zone 6

Transco has experienced an unplanned pipeline segment outage near its Compressor Station 195. The timeline to return this line segment to service is not available at this time.

Operating Conditions resulting from this unplanned outage will require Transco to manage primary-firm transportation services moving north to south through the TSB listed below.. The total quantity available will be contingent on system conditions and will initially be limited to the quantity indicated below effective Saturday February 10, 2024.

Transactions moving south to north through Station 195 will not be impacted. During this period of unplanned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through Station 195 will not be available.

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1674 will be used to manage capacity availability including any required changes to the expected total quantity available during this period. An updated Market and Production Area constraint notice will include this location and the available quantity of primary-firm transportation services.

TSB Name - Location

Location ID

Flow Direction

Total Primary-Firm Quantity Available (Mdt/d)

Station 195 MP 1674

9012103

North to South

2,239

If you have any questions, please contact your Transportation Services Representative.