TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 10/30/2023
Notice Eff Time: 09:00:00 CDT
Notice End Date: 11/10/2023
Notice End Time: 09:00:00 CST
Notice ID: 13988328
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 10/17/2023
Post Time: 14:34:06 CDT
Prior Notice: 0
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job #30000 Main Line Inspections 2023 Planned Outage and Maintenance

Job #30000 on the 2023 Planned Outage and Maintenance Summary will require reduced gas flow during pipeline inspection operations. The dates for this work are as indicated below.

During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through mainline milepost 1568.16 will not be available.

Operating Conditions resulting from this work may require Transco to limit primary-firm transportation services moving north to south through mainline milepost 1568.16. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through mainline milepost 1568.16 will not be impacted.

Date

Total Quantity Available (Mdt/d)

October 30, 2023

1,900

November 1, 2023

1,900

November 3, 2023

1,900

November 7, 2023

1,900

November 9, 2023

1,900

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1568.16 will be used to manage the availability of transportation services during this planned work. This TSB will be included on a Market and Production Area constraint notice.

TSB Name - Location

Location ID

Flow Direction

Mainline Mile Post  1568.16

9012743

North to South