TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 09/06/2023
Notice Eff Time: 09:00:00 CDT
Notice End Date: 10/21/2023
Notice End Time: 09:00:00 CDT
Notice ID: 13985000
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 10/16/2023
Post Time: 10:34:22 CDT
Prior Notice: 13940665
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update Job 945697 and 945698 Station 195 2023 Planned Outage and Maintenance Summary

Transco has provided notice of planned outages at its Station 195 associated with Job #945697 and Job #945698 on the 2023 Planned Outage and Maintenance Summary which require Station 195 to be off-line. The compressor station outage associated with both of these jobs (Phase 1 and Phase 2) is expected to be completed on October 20, 2023.

During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through Station 195 will not be available.

Operating Conditions resulting from this work will also require Transco to limit primary-firm transportation services moving north to south through Station 195. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through Station 195 will not be impacted.

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1674 (Station 195) will be used to manage the availability of transportation services during this planned work. This TSB will be included on a Market and Production Area constraint notice.

TSB Name - Location

Location ID

Flow Direction

Total Quantity Available (Mdt/d)

Station 195 MP 1674

9012103

North to South

2,150

If you have any questions, please contact your Commercial Services Representative.