TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 09/18/2023
Notice Eff Time: 09:00:00 CDT
Notice End Date: 11/07/2023
Notice End Time: 09:00:00 CST
Notice ID: 13901574
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 09/13/2023
Post Time: 15:13:54 CDT
Prior Notice: 13827419
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update Job 393219 Station 100 2023 Planned Outage and Maintenance Summary

As a reminder, Transco will be performing planned maintenance associated with Job # 393219 which will require Compressor Station 100 to be off-line. This work is currently scheduled from September 18, 2023, through November 6, 2023.

Operating Conditions resulting from this work may require Transco to limit transportation services, including Primary Firm services moving south to north through Station 100. The available capacity may vary during this planned maintenance period and is currently expected to be 4,300 Mdt/d. Transactions moving north to south through Station 100 will not be impacted.

Non-primary transportation services, including Non-Secondary Reveres Path (NSRP), Secondary FT, and Interruptible (IT) availability are not expected to be available during this period.

The receipt-based Throughput Section Boundary (TSB) Station 100 MP 890.591 will be used to manage the availability of transportation services from south to north during this planned work and will be included on a Market and Production Area constraint notice.

TSB Name - Location

Location ID

Quantity Available (Mdt/d)

Flow Direction

Station 100 MP 890.591

9012503

4,300

South to North

If you have any questions, please contact your Commercial Services Representative.