TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 09/26/2023
Notice Eff Time: 09:00:00 CDT
Notice End Date: 10/20/2023
Notice End Time: 09:00:00 CDT
Notice ID: 13859311
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 08/28/2023
Post Time: 10:22:04 CDT
Prior Notice: 13811852
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update Job 945689 Delaware River R. 2023 Planned Outage and Maintenance Summary

Transco has provided notice of a planned outage associated with Job # 945689 on the 2023 Planned Outage and Maintenance Summary associated with work as part of Transco’s Regional Energy Access expansion project. This planned work is scheduled from September 26, 2023, through October 19, 2023.

During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving west to east through Station 515 will not be available.

Operating Conditions resulting from this work may also require Transco to limit primary-firm transportation services moving west to east through Station 515. Any limitations to primary-firm and the total quantity available will be contingent on utilization and system conditions during the maintenance period. Transactions moving east to west through Station 515 will not be impacted.

The receipt-based Throughput Section Boundary (TSB) at Leidy Line milepost 81.70 (Station 515) will be used to manage the availability of transportation services during this planned work and will be included on a Market and Production Area constraint notice if reductions to primary-firm are required.

TSB Name - Location

Location ID

Flow Direction

Station 515 Leidy MP 81.70

9011600

West To East

If you have any questions, please contact your Commercial Services Representative.