TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 06/01/2023
Notice Eff Time: 13:44:03 CDT
Notice End Date:
Notice End Time:
Notice ID: 13640389
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 06/01/2023
Post Time: 13:44:03 CDT
Prior Notice: 0
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Planned Pipeline Integrity Assessments - Station 100 to Station 120

Transco will be performing pipeline integrity assessments on certain pipeline segments between Compressor Station 100 and Compressor Station 120 over the next several months. Transco will be working diligently to minimize any impacts associated with this work.

Contingent on utilization during this period, Operating Conditions resulting from this work may require Transco to limit transportation services, including Primary Firm services moving south to north through this area of the system. Transco will update the existing Throughput Section Boundaries (TSB) and establish a new TSB to manage the availability of transportation services. Transactions moving north to south through these locations will not be impacted.

During periods of higher utilization, non-primary transportation services, including Non-Secondary Reveres Path (NSRP), Secondary FT, and Interruptible (IT) availability are not expected to be available. If any limitation to Primary Firm services is required, an additional notice will be provided.

The TSB locations will be included on a Market and Production Area constraint notice and will indicate the quantity of transportation services available from south to north.

TSB Name - Location

Location ID

Flow Direction

Del/Rec

Type

Station 100 MP 890.591

9012503

South to North

Rec

Location

Station 110 MP 969.50

9012504

South to North

Rec

Location

TSB MP 890.58 to MP 1050

5000045

South to North

Del

Segment

If you have any questions, please contact your Commercial Services Representative.