TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 03/13/2023
Notice Eff Time: 09:00:00 CDT
Notice End Date: 03/28/2023
Notice End Time: 09:00:00 CDT
Notice ID: 13376922
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 02/20/2023
Post Time: 12:56:09 CST
Prior Notice: 0
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job # 881024 2023 Planned Outage and Maintenance Summary

Transco has provided notice of planned maintenance activity associated with Job #881024 on its 2023 Planned Outage and Maintenance Summary. This planned maintenance will require a section of pipeline to be isolated and removed for service. This work is currently scheduled from March 13, 2023, through March 27, 2023.

During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through Station 180 will not be available.

Operating Conditions resulting from this work may also require Transco to limit primary-firm transportation services moving north to south through Station 180, contingent on utilization during the outage period. Transactions moving south to north through Station 180 will not be impacted.

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1540.0 (Station 180) will be used to manage the availability of transportation services including any required changes to the expected total quantity available during this planned work if required. This TSB will be included on a Market and Production Area constraint notice and will indicate the availability of transportation services throughout the work period.

TSB Name - Location

Location ID

Flow Direction

Station 180 MP 1540.0

9011860

North to South

If you have any questions, please contact your Commercial Services Representative.