TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 09/07/2022
Notice Eff Time: 13:50:07 CDT
Notice End Date:
Notice End Time:
Notice ID: 12933670
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 09/07/2022
Post Time: 13:50:07 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Unplanned maintenance McMullen lateral

Effective 9/7/2022 ID2 Cycle until further notice, Transco will be required to isolate a portion of its McMullen Lateral to perform unplanned repairs. During this work Transco’s McMullen System will be isolated from Transco’s Mainline System.

Until further notice, all available delivery locations sited on the McMullen System must source gas from available receipt locations sited on the McMullen System. Gas received on the McMullen System will not be available for delivery to any location other than delivery locations sited on the McMullen System. Gas received on the Transco Mainline System will not be available for delivery to any location on the McMullen system.

The two Maintenance Location TSB’s, shown below, will be utilized to manage the scheduled quantities for all priorities during this work

Location ID

Location Name

Del/Rec

Type

Available Quantity Mdt/d

Highest Priority Included

9011482

McMullen MP 0.001

Rec

M-L

0

PRIMARY

9011483

McMullen MP 0.002

Rec

M-L

0

PRIMARY

In addition, Transco will be working with the following impacted location operators to manage flows.

Location Name

Location ID

Meter

Loc Type

Earl Holliman

1001208

1644

Receipt

Eagle Plant

9006902

3643

Receipt

Eagle Plant BB

9006903

4643

Delivery

If you have any questions, please contact your Commercial Representative.