TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 12/05/2023
Notice Eff Time: 14:12:53 CST
Notice End Date:
Notice End Time:
Notice ID: 14128644
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 12/05/2023
Post Time: 14:12:53 CST
Prior Notice: 14084902
Reqrd Rsp Desc: No response required
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update Unplanned Outage Station 195

Transco previously provided notice of an unplanned outage at its Compressor Station 195. Repairs are ongoing and the current estimated timeline for completion of this work is through gas day December 10, 2023.

During this period of unplanned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through Station 195 will not be available.

Operating Conditions resulting from this work will also require Transco to manage primary-firm transportation services moving north to south through Station 195. The total quantity available will be contingent on system conditions during the period and is anticipated to be within the range indicated below, although a quantity outside of the provided range is possible. Transactions moving south to north through Station 195 will not be impacted.

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1674 (Station 195)will be used to manage capacity availability including any required changes to the expected total quantity available during this period. An updated Market and Production Area constraint notice includes this location and the available quantity of primary-firm transportation services.

TSB Name - Location

Location ID

Flow Direction

Total Primary-Firm Quantity Available (Mdt/d)

Station 195 MP 1674

9012103

North to South

2,180 to 2,290

If you have any questions, please contact your Transportation Services Representative.