TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 04/12/2022
Notice Eff Time: 00:00:00 CDT
Notice End Date: 04/14/2022
Notice End Time: 00:00:00 CDT
Notice ID: 12437110
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 03/01/2022
Post Time: 15:34:55 CST
Prior Notice: 12387226
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update: Job # 252 Planned Outage and Maintenance Summary

Transco has provided notice of planned construction activity associated with Job #252 on its 2022 Planned Outage and Maintenance Summary.  This planned maintenance will require an outage at Compressor Station 190 from April 12 – April 14.

During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through station 190 will not be available.

Operating Conditions resulting from this work will require Transco to restrict all priorities (including primary firm) moving north to south through station 190 up to a total package of 2,300,000 dts a day (current design capacity is 2,684,000 dts). The actual volume impacted will be contingent on utilization during this period. Transactions moving south to north through station 190 are not expected to be impacted.

The existing receipt-based Throughput Section Boundary (TSB) at mainline milepost 1628.78 (Station 190) will be used to manage capacity during this planned work. An updated Market and Production Area constraint notice will be posted indicating the availability of transportation services throughout the work period.

TSB Name - Location

Location ID

Flow Direction

Station 190 MP 1628.78

9011620

North to South

 

If you have any questions, please contact your Commercial Services Representative.