TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 02/07/2022
Notice Eff Time: 00:00:00 CST
Notice End Date:
Notice End Time:
Notice ID: 12369186
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 02/03/2022
Post Time: 15:11:25 CST
Prior Notice: 12324442
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update: Job # 152 Planned Outage and Maintenance Summary

Transco has provided notice of planned construction activity associated with Job #152 on its 2022 Planned Outage and Maintenance Summary.  This planned maintenance requires modifications at Compressor Station 170 that may put the station out of service during February 7 – February 25, 2022.

During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through station 170 will not be available.

Operating Conditions resulting from this work may also require Transco to restrict primary firm gas transportation services moving north to south through station 170. The actual volume impacted, if any, will be contingent on utilization during this period. Transactions moving south to north through station 170 are not expected to be impacted.

A new receipt-based Throughput Section Boundary (TSB) at mainline milepost 1457.97 (Station 170) will be used to manage capacity during this planned work. An updated Market and Production Area constraint notice will be posted indicating the availability of transportation services throughout the work period.

TSB Name - Location

Location ID

Flow Direction

Station 170 MP 1457.97

9012163

North to South

 

If you have any questions, please contact your Commercial Services Representative.