TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 11/08/2021
Notice Eff Time: 00:00:00 CST
Notice End Date: 11/13/2021
Notice End Time: 00:00:00 CST
Notice ID: 12091591
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 10/26/2021
Post Time: 09:54:19 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job #175 Planned Outage and Maintenance Summary

Transco has provided notice of planned construction activity associated with Job #175 on its 2021 Planned Outage and Maintenance Summary.  This planned maintenance may require a mainline outage near the Compressor Station 195 facility during November 8 – November 13.

During this period of construction, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through station 195 will not be available.

Operating Conditions resulting during this work window may also require Transco to restrict primary firm gas transportation services moving north to south through station 195 up to 175,000 dts a day. The actual volume impacted, if any, will be contingent on utilization during this period. Transactions moving south to north through station 195 are not expected to be impacted.

A receipt-based Throughput Section Boundary (TSB) at mainline milepost 1674 will be used to manage capacity during this planned work. An updated Market and Production Area constraint notice will be posted indicating the availability of transportation services throughout the work window if needed.

TSB Name - Location

Location ID

Flow Direction

Mainline MP 1674

9012103

North to South

 

If you have any questions, please contact your Commercial Services Representative.