TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 10/26/2021
Notice Eff Time: 00:00:00 CDT
Notice End Date:
Notice End Time:
Notice ID: 12034519
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 10/04/2021
Post Time: 15:00:02 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job #522 Planned Outage and Maintenance Summary

Transco has provided notice of planned construction activity associated with Job #522 on its 2021 Planned Outage and Maintenance Summary.  This planned maintenance will require a day outage at the Compressor Station 185 facility. The current schedule requires the existing compression facility to be out of service for one day on October 26, 2021.

During this period of construction, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through station 185 will not be available.

Operating Conditions resulting from this work may also require Transco to restrict primary firm gas transportation services moving north to south through station 185 up to 570,000 dts a day. The actual volume impacted, if any, will be contingent on utilization during this period. Transactions moving south to north through station 185 are not expected to be impacted.

A receipt-based Throughput Section Boundary (TSB) at mainline milepost 1582 will be used to manage capacity during this planned work. An updated Market and Production Area constraint notice will be posted indicating the availability of transportation services throughout the work period.

TSB Name - Location

Location ID

Flow Direction

Mainline MP 1582

9011180

South to North

 

If you have any questions, please contact your Commercial Services Representative.