TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 09/16/2021
Notice Eff Time: 09:21:52 CDT
Notice End Date:
Notice End Time:
Notice ID: 11986192
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 09/16/2021
Post Time: 09:21:52 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job #483 Planned Outage and Maintenance Summary

Transco’s Job #483, as referenced in Transco’s Planned Outage and Maintenance Summary, is currently scheduled to begin October 18, 2021 with a planned completion on October 22, 2021 (“System Outage Period”).

During the System Outage Period, the location(s) listed below will not be available for scheduling or flow:

Location ID

Location Name

9003560

Terrebonne

1000033

Ship Shoal 28D

1000072

SMI 107

1000074

SMI 130A

1005777

SMI 147

1000035

SS 72J

1000082

Vermilion 331

1005779

Ship Shoal 58

1000003

Eugene Island 100