TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 06/04/2021
Notice Eff Time: 00:00:00 CDT
Notice End Date: 06/12/2021
Notice End Time: 00:00:00 CDT
Notice ID: 11661799
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 05/13/2021
Post Time: 09:03:15 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Job Outage #423 Planned Outage and Maintenance Summary

Transco is providing notice of maintenance activity associated with Job #423 on its 2021 Planned Outage and Maintenance Summary.  This maintenance requires exchanging the existing turbine at Station 83 from June 4, 2021 June 12,2021.

Operating Conditions resulting from this work may also require Transco to restrict primary firm gas transportation services moving north to south through Station 83 up to 110,000 dts/day. The impact to transportation services, if any, will be contingent on utilization during this period. Transactions moving south to north through Station 83 are not expected to be impacted as a result of this work.

During the outage the maintenance location TSB below will be used to manage scheduled volumes from North to South through Station 83.

Loc ID

Location Name

ZN

Del/Rec

Type of TSB

Available Capacity Mdt/d

Highest Priority Included

Flow Dir

9011943

Station 83 MP 68

4A (Mobile Bay)

Rec

M-L

748

PRIMARY

N to S

An updated Market and Production Area constraint notice will be posted indicating the availability of transportation services during this period.

If you have any questions, please contact your Commercial Representative.